Survey the plot by doing the math. One marker at a time.
●●●●●●●○
RANK ON COMPLETION: MASTER SURVEYORWEEK 32
MARSHAL WREN, THE SURVEYOR: "A blueprint is the ground written down. Draw only what you measured."
THE GROUNDWORK FILES // EPISODE 8 // THE SECOND BLUEPRINT
The last plot is the drafting table itself: boundaries walked, interiors filled, every corner of the plane named and claimed.
PREVIOUSLY The power bills inflated in the exponent, never the base. Seven entries. The ledger is almost a name.
THE CASE Draftsman Ambrose Tate filed two blueprints of the same building. One was drawn by the ground; the other was drawn by a budget.
Filed by the quartermaster, Pippa George.
Crew name: Class key:
The run will not start without a name. Ten markers, three hint tiers each. Written work handed in class is the gate: no paper, no credit.
Run Voucher
Crew: Class key: Course: Pre-Algebra (GROUNDWORK) Run component: Plot 08: The Blueprint Room Rank on completion: Master Surveyor POINTS AWARDED: on the 5 point scale (whole number, never a percent) Ledger: entry 8 of 8, filed and carried to The County Plat Hint tiers used: Quartermaster of record: Pippa George Run date:
PIPPA GEORGE · QUARTERMASTER STAMP
Paper gate: written work handed in class is the gate. No paper, no credit.